BAUMANN Ingenieur-Consulting GmbH

A-4600 Wels / Austria

Holterstraße 17 / 12

Mail: office@baumann-ic.at

Phone: +43-7242-35006

Baumann_Logo_Gmbh_RGB.jpg

Consulting – Design – Tendering – Site Supervision – Expert Opinions

 

 Home

 Services

 References

 About us

 Contact

 Jobs

 General Terms

 Legal Notice

 

-        Some References:

-        Subcontract: Owing to our particular know-how in these work areas, we received these contracts from specialised colleagues.

-         

-        Water Management and Land Management

-        Municipality Buchkirchen/ Raika Buchkirchen: drinking water supply to the housing development of Eiselsbergstraße, Municipality of Buchkirchen

-        Real Treuhand Immobilien GmbH: parking lot drainage for the retail centre Schwanenstadt

-        AREV-Immobilien: surface drainage at the Centre Prinz Eugen, Linz

-        ARAL Austria: drinking water well and protected area for a Marchtrenk petrol station

-        Reiter family: small wastewater treatment plant, St. Thomas am Blasenstein

-        Megaplex Cinema: hydraulic calculations for groundwater preservation, Pasching

-        Richter Pharma AG: 

-        industrial sewage treatment for a pharma company, Wels

-        Aquarium Linden:

-        industrial sewage treatment for the needs of the aquarium, Steinerkirchen

-        PPI Plastic Products Innovation GmbH&CoKG: cooling water extraction and percolation, Ebensee (subcontract)

-        Raiffeisenbank: canal overhaul, Buchkirchen

-        Jandl Transport GmbH: district construction project, Buchkirchen

-        Spar-Markt: geothermal probe for a heat pump, Eberschwang

-        Dierneder family: exploration of variants for wastewater discharge, Windhaag

-        City of Wels: construction supervision for a wastewater collector, Wels

-        ÖBB (Austrial Railway): culverting of a rail embarkment with a wastewater collector, Bad Goisern (subcontract)

-        Water Cooperative Mayrhof-Reith: drinking water supply, Rutzenmoos (subcontract)

-        Kreuzmayr GmbH: indirect discharger report and surface drainage for a petrol station, Eferding

-        Heinisch Textilveredelung GmbH&CoKG: indirect discharger report for a dye factory, Hörsching (subcontract)

-        Horizont 3000: restoration of the water supply and wastewater disposal, St. Mary’s Hospital Lacor, Gulu, Uganda

-        Antunovic family: certificate of surface drainage for a building parcel, Wels

 

Procedures with Authorities

Please bear in mind that the references under this section can only be presented anonymously to protect our customers.

-        Preparation of submission documents for a permit and obtaining a permit under the water act for the drainage of a housing development after the authority previously gave a negative evaluation for the project under another planner

-        Obtaining a water permit under the water act for the discharge of industrial wastewater after the authority previously gave a negative evaluation for a project drafted by the applicant himself

-        Providing support for a power plant operator in response to the demand of the authority for improving the plant to comply with the state of the art by means of residual water discharge (subcontract)

-        Obtaining approval under the water act for the reissue of a number of expired water permits for well systems

-        Obtaining water permits under the water act for a drinking water well, in spite of the fact that the demands by the authority as a well protection area cannot be met

-        Certificate of tidewater safety for a single-family home. Obtaining permits under building and water act in spite of an appeal filed by neighbours

-        Subsequently obtaining permits under industrial and building law for a producing enterprise with more than 100 employees

-        Industrial plant permits for several locksmiths

-        Industrial plant permit for a logistics centre

-        Industrial plant permit for a warehouse

-        Storage room in compliance with the VbF (Ordinance on flammable fluids) and documents in accordance with VEXAT (Ordinance on explosive atmosphere) for the industrial plant permit for a business (subcontract)

-        Reviews according to Sec. 82b GewO (Industrial Code) for different enterprises (e.g. restaurants, locksmiths, glazier's shops, carpenters shops, stove builders, warehouses and shoe producers)

-        Reviews according to Sec. 134 WRG (Water Act) for various plants (e.g. cavity percolation and well systems)

-        Industrial plant permit for a powder-coating plant

-        Industrial Code permit for a restaurant

-        Industrial Code permit for a garden centre

 

Industrial and Occupational Safety

-        Andritz Hydro GmbH: preparation of the HSE documents for the infrastructure project at Nkula, Malawi

-        Andritz Hydro GmbH: HSE Consultant for the construction of the New Assiut Barrage Hydropower Plant at Assiut, Egypt

-        Energji Ashta sh.p.k.: preparation of the H&S documents for the 48-MW hydro power plant Ashta near Shkoder, Albania

-        Andritz Hydro GmbH Austria: HSE Consultant for the construction of the Kaunertal Hydro Power Plant penstock system, Prutz, Austria

-        Siemens AG Germany: Execution of a HAZID-Study for the 1.600-MW gas and steam power plan Shuweihat S3 at Abu Dhabi

-        Verbund Renewable Power GmbH: preparation of the health&safety plan and safety relevant documents for the 200-MW windpark Casimcea, Romania

-        ARGE HABAU/Streicher: Safety engineer for the construction of a gas-pipeline (600mm and 900mm) in Austria and Germany

-        Siemens AG Austria: design safety coordinator for the 400-MW gas and steam power plant HEMWEG at Amsterdam, Netherlands

-        Siemens AG Germany: design safety coordinator for the 400-MW gas and steam power plant DIEMEN at Amsterdam, Netherlands

-        Verbund Hydro Power AG: HSE Consultant for the construction of a 48-MW Hydro-Power-Plant Ashta near Shkoder, Albania

-        Siemens Power Generation Anlagentechnik GmbH: HSE-coordinator for the 400-MW gas and steam power plant Timelkam (subcontractor)

-        Siemens Power Generation Anlagentechnik GmbH: preparation of VEXAT-documentation for the construction phase and start-up phase of the 400-MW gas and steam power plant Timelkam

-        City of Linz: creation of the health&safety plan for the renaturation of the collection channels in Urfahr

-        City of Lenzing: creation of the health&safety plan and site safety coordinator for the infrastructure project of a new housing area

-        Stecco: storing of ground water-harming material, Aurachkirchen (subcontractor)

-        Brandstetter, joinery: development of fire prevention plan, St Marien (subcontractor)

 

logo_mit_claim_wissen_wie_s_gelingt_rgb_jpg.jpgBAUMeister_Logo_4C.jpg